Getting started

From grounded to full altitude

Always start small: one team and one product, not the whole organisation at once. Four phases, three gates, and a clear picture of where you stand before you begin.

Implementation

Four phases, three gates

Each transition has a gate with clear criteria, so nobody scales up before the previous phase works.

  1. About 2 weeks

    Kite Scan

    Baseline and interviews. Zones mapped.

  2. About 6 weeks

    First flight

    One pilot team. Brief, zones and loop running.

    Gate 1
    Pilot team chosen, baseline in place
  3. About one quarter

    Steady flight

    Strengthen the Tail. Roles and metrics in place.

    Gate 2
    Rework not higher, team wants to go on
  4. Ongoing

    Full altitude

    More teams on board. Internal Kite coaches.

    Gate 3
    Zone mix shifting, review load manageable

Durations are indicative and agreed per client. Each gate must be passed before the next phase starts.

Deliverables

What you have at the end of each phase

Kite Scan

A report with the maturity level per part, a baseline of the six metrics, and a proposal for the pilot team and initial zone routing.

First flight

A working Kite Brief template, zone routing for the pilot team, a running Kite Loop with Daily Demo, and a first Human Anchor list.

Steady flight

A stronger Tail, Kite roles filled, a metrics dashboard, and the first recalibration of the zones.

Full altitude

Rollout to more teams, trained internal Line Keepers and Kite coaches, and the method embedded in onboarding.

Maturity

How high does your team already fly?

The Kite Scan places each part of the kite on one of four levels.

  1. Grounded

    AI is used ad hoc, with no shared way of working.

  2. Taking off

    AI builds along, but review and verification lag behind.

  3. Steady flight

    Zones and the Kite Loop are running and the metrics are in place.

  4. Full altitude

    Most work flies in Free and Guided, with a strong Tail and living anchors.

Ask yourself

Eight scan questions

These are the questions the Kite Scan starts from, two per part of the kite. Answering them honestly already shows where your line is slack.

Have us run the full Kite Scan →

PartScan question
FrameDoes work start with a testable description of the goal and acceptance criteria?
FrameAre architecture rules captured in a form an agent can read?
SailWhat share of the build work do AI agents do today, and who steers them?
SailDo agents work on several items in parallel, or one at a time next to a developer?
TailHow confident is the team that green tests really mean “works”?
TailIs every production failure turned into a test or guardrail?
LineIs there a named human who signs off each release?
LineCan juniors explain what they deliver, even when AI built it?
Start with a Kite Scan

Find out how high your team already flies.

In about two weeks, a few conversations and a short questionnaire give you a maturity level per part of the kite, a baseline of the six metrics and advice for your first flight.

Email us
Open in mail app